DAVIT TESTING
6 monthly testing for davit arms
and bases
Davit Testing
Davit Arm Systems used for facade access and working at height need to be tested for compliance every 6 months.
Davit systems are a popular solution for facade access on high rise buildings. Davit systems are tested to LOLER regulations. Where the systems are not only visually inspected but also load tested to ensure they are safe and work as intended.
Tested by LEEA trained technicians
Manufacturers and designers of the abseil equipment
Qualified testing available across the UK
Service Details
LOLER testing is a legal requirement for all equipment and parts that are to be used for abseiling or lifting. LOLER testing must be performed every 6 months to ensure the equipment can be used. Sayfa Group are designers and manufacturers of market leading abseil equipment.
Having your LOLER test by Sayfa Testing and Training ensures you the most experienced testers, with LEEA certification and detailed product design and fitting details to perform the tests correctly and accurately.
Our engineers can also perform any remedial and maintenance work that may be required in the same visit as they have access to approved and certified parts from Sayfa Group.
Tested by the product designers and manufacturers.
Test and Remedial works can be done in minimal visits.
Get regular testing reminders and detailed test and certification history for easy management.
Book now
All safety equipment needs, by law, regular inspection and maintenance. Stay compliant and legal by ensuring all your inspection and testing is done on time, by qualified people.
Regular testing keeps intact the product warranty and also meets requirements of most insurance providers.
Get in touch now to book your retest and certification.